Indicative estimate

What would a manual migration cost you?

Enter the parameters of the project you are evaluating: the simulator estimates the cost of a manual migration and compares it with a savings assumption that you set. Scriba's price is fixed and guaranteed, set out in a quote.

Fixed
Guaranteed price, set out in the quote before work starts
0
Subscriptions, usage-based fees or hidden costs
≤ 30,000
Lines of code in a PoC scope
16
Documents in the standard delivered set

Your project

These values describe the manual migration you are evaluating.

5K5M

Over 30,000 lines: the PoC runs on a closed sub-process within the limit, or you move straight to an engagement, which has no such limit.

150
136
€4,000€20,000
10%80%

You set it: it is not a figure stated by Scriba, nor a guaranteed result.

Indicative estimate

Estimated cost of the manual migration
€1,440,000

Manual effort: 120 person-months

Indicative saving under your assumption
~€720,000

Cost reduction assumption: 50%

Scriba price
Fixed, on quote

Set after analysing the package, based on the lines of active logic and the complexity of the environments involved.

Request a fixed-price quote

How to read this estimate

This is an indicative estimate, calculated only from the values you enter (manual cost = developers × months × monthly cost) and the reduction assumption you choose. It is neither a quote nor a guaranteed result. Scriba's price is fixed and guaranteed and is set out in the quote, after analysing the package, based on the actual size and composition of the scope.

Proof of concept

Before the engagement, a verifiable result on your own code

The PoC applies the same working model as an engagement to a smaller scope. If it succeeds, it becomes the basis for sizing the fixed-price quote.

How the PoC works
  1. 01

    Closed scope, up to 30,000 lines

    A complete process with its dependencies, counted excluding comments and blank lines.

  2. 02

    Criteria agreed in advance

    Tests and quality gates declared in test.md before the start, including differential tests against the original.

  3. 03

    A single pass

    Complete configuration up front: instructions and tests are frozen when the PoC starts.

  4. 04

    Complete deliverables

    Migrated code, tests, data sets, documentation and validation evidence, with traceability back to the source.

  5. 05

    Terms in the PoC agreement

    Scope, success criteria, deliverables, timing and commercial terms are set out in the PoC agreement, before the start.

Want a fixed price on your code?

Propose a closed scope of up to 30,000 lines for a PoC, or send us your package for a fixed-price quote based on the actual scope.